We regrounded the house to where the copper water pipe comes in from under the street. We cut the copper pipe disconnecting the house plumping. That was that - no turning back. We installed the whole house shut-off valve and installed the pex to where the pex manifold will go on the concrete wall. I painted the wall with drylock. I installed a T and more pex to a brand new 50 gallon electric water heater - which I moved to a convenient spot *for me*. Since all the plumbing is new, I don't have to put the water heater where it was - I can put it where I want it, so it went in the corner. The connections are purchased, the special orders have arrived and now I am just going to wait for the second coat of varnish on the floors to finish the plumbing.
Really getting there!
I LOVE the Pexcaliber crimping tool. Absolutely LOVE it. I also love the name. I'm cheesy like that.
Monday, January 12, 2009
First Coat of Varnish on the Floors
I haven't done a lot of updating, but that doesn't mean I haven't done a lot of working. It could be said I have been working too much to bother with the updating...
I have the floors nailed, leveled, sanded, filled, screened, cleaned and the first coat of varnish is applied.
The above three sentences represent about 300 hours of work. Pictures coming soon.
I have the floors nailed, leveled, sanded, filled, screened, cleaned and the first coat of varnish is applied.
The above three sentences represent about 300 hours of work. Pictures coming soon.
Subscribe to:
Posts (Atom)